POWER PLANTS ON GRID

IRES-ANEMON
Turkey
1996

Wind measurements, site evaluation, turbine selection, permissions (30.36 MW) Implementation Agreement signed 23 October 2000.
IRES - ANEMON
is commissioned in 2007 and planning to generate 108 Mio kWh annually
İntepe Anemon İntepe Anemon İntepe Anemon
İntepe Anemon İntepe Anemonİntepe Anemon
İntepe Anemon
İntepe Anemon İntepe Anemon

Most recent investment in renewable energy is in a 30.4 MW wind farm in Turkey: Anemon Enerji. The new construction consists of a grid connecting 38 wind turbines and has anticipated electricity output of 108,000 MWh per year, which is expected to reduce the equivalent of 74,700 tonnes of CO2 emissions each year.
   
Anemon Enerji has been certified by The Gold Standard, a certification scheme that recognizes the best projects in the Clean Development Mechanism (CDM), Joint Implementation (JI) and voluntary offset markets. Over 49 non governmental organizations, including Greenpeace, REEEP, and WWF International, endorse the Gold Standard method.



Turkey ALAÇATI 1
7,2 MW
1997 – 1998
Wind measurements, site evaluation, turbine selection, Concession Agreement, purchasing, installation
and operation, FIRST BOT wind contract in Turkey.
- ON GRID SINCE December 1998
- Total Installed Capacity: 7,2 MW
- Total Investment Value: USD 8.8 Mio
Alaçatı RES Alaçatı RES Alaçatı RES
Alaçatı RES Alaçatı RES Alaçatı RES

7.2 MW ARES Wind Power Plant in Turkey
ARES is Turkey's first B.O.T. (Build-Operate-Transfer) wind power plant, located 80 km from Izmir on the western end of Çesme Peninsula. Since its inauguration end of November 1998, the plant has produces annualy 19 Million kWh of clean energy. ARES provides for 20 % of the electricity consumed by coastal towns of Alaçati and Çesme, with a population of 50'000 in winter and over 100'000 during summer.
   
Interwind Ltd. developed the project from wind measurements on site, over the thorny roads of the first B.O.T. wind energy contract of Turkey, up to grid connection. The project was initiated by Mr. Ergün Özakat of Çesme, Mr. Remzi Özen, the Mayor of the Municipality of Alaçati and Lockheed Martin Investment Holding A.S. of Ankara. The wind park was financed by Gücbirligi Holding A.S. Izmir, which also is the majority shareholder and operator of the wind park.
   
ARES has proven that it is possible to realize feasible wind energy projects in Turkey, with Turkish financing. This first B.O.T. wind park has opened a new era: Interwind expects 250-300 MW installed wind power in Turkey by the end of 2001.



Switzerland JUVENT
MT-CROSIN
1996-1997
- Wind data evaluation, turbine selection and purchasing assistance for the first wind park in Switzerland (1.8 MW) for BKW Energie AG
- ON GRID SINCE November 1997
- Total Installed Capacity: 1,8 MW
- Total Investment Value: CHF 3.500.000
İsviçre JUVENT


Switzerland
MT-CROSIN
1998
- Purchasing assistance for fourth turbine (0,66 MW)
- ON GRID SINCE November 1998
- Total Installed Capacity: 0,66 MW
- Total Investment Value: CHF 900.000
İsviçre MT-CROSIN


Switzerland JUVENT
2000
- Purchasing assistance for fifth and sixth turbines (0,85 MW)
- ON GRID SINCE July 2001
- Total Installed Capacity: 1,7 MW
- Total Investment Value: CHF 2.200.000
İsviçre JUVENT


WIND POWER PROJECTS IN DEVELOPMENT

WALEN1
Switzerland
1995
Wind site evaluation for a private client (1.2 MW)
EBIS
Switzerland
1996/97
Development of a virtual reality (CD-ROM/Internet) based marketing tool for wind park MT-CROSIN
WALEN2
Switzerland
1996
Wind site evaluation (3 MW) a private client
DISPLAY
Switzerland
1997
Public information system for Project MT-CROSIN
ST-CROIX
Switzerland
1997-1998
Wind Measurements for determination of technical and economical feasibility of a 6 - 9 MW wind park in St-Croix
HATEKS1
Turkey
1996

Wind site evaluation, tendering, turbine selection, building permission (1.2 MW),
Turkey’s Firsts;
    - Wind Measurement for Wind Energy applications(Wind Report-Micro Siting),
    - Feasibility Report,
    -s Autoproducer Agreement with MENR

KIRES
Northern Cyprus
1999-2000
Installation of wind measuring masts, wind measurements, site evaluation, turbine selection and feasibility report for 3 different sites in K.K.T.C. (Northern Cyprus)
BARES 1- 3
Turkey
1999
Wind measurements, site evaluation, feasibility report and preliminary application Balikesir, Turkey (Total 185 MW)
390 MW MENR Tender
Turkey
2000-2001
Wind measurements for 3 clients, at 22 locations in Turkey, Ministry of Energy canceled the 390 MW Tender
75-90 MW Tender
Jordan
2001
Mast Installations, Wind Measurements and feasibility studies for 3 locations

REPORTS AND STUDIES FOR CUSTOMER

Project TALEN, a 18 MW wind park in Turkey March 1994
Pre-feasibility report for a 4,8 MW wind park in
A Modern Wind Park in Çeşme Area
Yaşar Holding Izmir, Turkey
July 1995
1.2 MW Auto-producer feasibility report for application to Ministry of Energy
Hateks Hatay Tekstil İşletmeleri A.Ş., Turkey
March 1996
Feasibility study for a pilot wind energy plant in Turkey
European Wind Energy Association
December 1996
Feasibility report for 70 MW wind power plant
Hateks Hatay Tekstil İşletmeleri A.Ş. Hatay, Turkey
April 1997
Cost-Efficiency-Benefit analysis of 250-600W battery charger systems
Automotores Guildemeister Santiago, Chile

March 1997

IRES, Results of wind measuring study
Intepe Municipality, Turkey
October 1997
IRES Final feasibility report for a 30MW wind park
Ministry of Energy Turkey and Wind Generation Ltd.
December 1998
Feasibility study for a 11.5 MW wind park in Sainte-Croix,
Switzerland
December 1998
K.K.T.C. Wind Power Plant site assessment, wind study, feasibility report with financial analyze at 3 different sites
Foreign Affairs Ministry of Turkey, Northern Cyprus
November 1999
Wind Report and micro-siting. at 2 sites,
Zorlu Enerji A.Ş in Turkey
May 2000
Wind Report and micro-siting at 12 sites
Bayindir Holding A.Ş. in Turkey
May 2000
Wind Report and micro-siting at 12 sites
Wind Generation Ltd. in Turkey
May 2000
Jordan Wind Power Plant Project: Wind Report, Micro-siting and turbine selection for 2 sites, Aqaba and Fujeij
RSWI Canada, in Jordan
April 2002
Strategic Assessment Of The Potential For Renewable Energy Resources In Former Soviet Countries for EBRD Augustus 2002
Turkish Air Force Wind Power Development Project, Site assessment and wind measurement
Turkish Air Force Headquarter Ankara, Turkey
July 2002
Rural Villages Wind, Diesel And Solar Electrification Study At 8 Major Sites
Jordan Rural Electrification State Organization
May 2003
At two wind site Wind Power Development Project, Site assessment and wind measurement at Çanakkale region
ENERJİSA, SABANCI HOLDİNG
Apr 2004